← All Topics

Renewables Ev: Evse

5 question stems • Page 1 of 1

Question 1

For a multi-unit residential building (MURB), four 80-ampere Level 2 EV chargers are being installed with a 'load management system' (Energy Management System - EMS). According to CEC Section 8 concepts, how should the branch circuit and feeder demand be calculated?

Question 2

When installing a Level 2 Electric Vehicle (EV) charger at a residential site, how should the branch circuit be sized for a continuous load of 40A?

Question 3

For a dwelling unit, a 48-ampere Level 2 Electric Vehicle Supply Equipment (EVSE) is being installed on a dedicated branch circuit. According to NEC Article 625 concepts, what is the minimum overcurrent protection device (OCPD) rating and minimum conductor ampacity required?

Question 4

What is the key difference between an EVSE Level 1 and Level 2 charger?

Question 5

When installing an Electric Vehicle (EV) charger (EVSE), which circuit rating is commonly required for a Level 2 residential charger?